L.A. Unified seismic inventory
More than 600 of the Los Angeles Unified School District’s 13,000 buildings require evaluation for seismic safety and possible retrofit at a cost estimated to be more than $900 million. Of the 667 buildings in the district’s inventory, 19 have been retrofitted and 5 demolished. Another 21 have been evaluated or are in the process of being strengthened.
1/7
Seismic priority* | School | Bldg use | Structure description | Year built | 2007 est. construction costs | Current status |
---|---|---|---|---|---|---|
4 | Birmingham Senior High | Other | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1944 | $135,037 | NA |
4 | Birmingham Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1966 | $2,752,142 | NA |
4 | Calabash Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $248,660 | NA |
4 | Calabash Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $371,793 | NA |
4 | Calabash Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $438,994 | NA |
4 | Calabash Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $514,719 | NA |
4 | Calabash Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $143,349 | NA |
4 | Canoga Park Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1935 | $1,109,808 | NA |
4 | Canoga Park Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1936 | $284,144 | NA |
4 | Canoga Park Senior High | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $702,065 | NA |
4 | Canoga Park Senior High | Cafeteria | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $896,839 | NA |
4 | Canoga Park Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1955 | $1,901,518 | NA |
3 | Chase Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1950 | $83,982 | NA |
4 | Chatsworth Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $322,834 | NA |
4 | Chatsworth Senior High | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1963 | $1,151,635 | NA |
4 | Chatsworth Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1963 | $2,889,125 | NA |
4 | Cleveland Senior High | Classroom/Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1960 | $1,364,325 | NA |
4 | Columbus Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1959 | $1,049,019 | NA |
4 | Columbus Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1959 | $1,656,904 | NA |
1 | El Camino Real Senior High | Athletic Facility | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1969 | $2,873,196 | Complete |
4 | El Camino Real Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1969 | $12,546,388 | NA |
4 | El Camino Real Senior High | Manual Arts | Mixed construction containing a combination of two or more of the other structure types defined | 1969 | $2,437,058 | NA |
4 | El Camino Real Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1969 | $321,785 | NA |
2 | Frost Middle School | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $109,255 | In Design |
2 | Frost Middle School | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $1,445,187 | In Design |
2 | Frost Middle School | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $109,255 | In Design |
4 | Hale Middle School | Multi-Purpose | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $1,659,481 | NA |
4 | Hale Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1963 | $1,686,183 | NA |
4 | Haynes Elementary | Eating Area | Steel cantilever columns with wood roofs | 1960 | $155,892 | NA |
3 | Henry Middle School | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $1,015,491 | NA |
3 | Henry Middle School | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $1,270,139 | NA |
3 | Henry Middle School | Other | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $91,645 | NA |
4 | Justice Elementary | Classroom/Admin | Steel light frame with metal siding and/or rod bracing | 1959 | $175,516 | NA |
4 | Justice Elementary | Multi-Purpose | Steel light frame with metal siding and/or rod bracing | 1959 | $275,320 | NA |
4 | Justice Elementary | Classroom | Steel light frame with metal siding and/or rod bracing | 1959 | $273,346 | NA |
4 | Justice Elementary | Classroom | Steel light frame with metal siding and/or rod bracing | 1959 | $376,287 | NA |
4 | Justice Elementary | Classroom | Steel light frame with metal siding and/or rod bracing | 1959 | $103,599 | NA |
3 | Kennedy Senior High | Library | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $754,222 | NA |
3 | Kennedy Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $3,691,862 | NA |
3 | Kennedy Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $2,777,526 | NA |
3 | Kennedy Senior High | Other | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $94,251 | NA |
3 | Kennedy Senior High | Cafeteria | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $806,912 | NA |
3 | Kennedy Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $995,274 | NA |
3 | Kennedy Senior High | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $139,686 | NA |
3 | Kennedy Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $174,626 | NA |
3 | Kennedy Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $259,649 | NA |
3 | Kennedy Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $176,034 | NA |
3 | Kennedy Senior High | Manual Arts | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $1,736,042 | NA |
3 | Kennedy Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1971 | $2,926,648 | NA |
4 | Langdon Elementary | Eating Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $127,359 | NA |
4 | Lockhurst Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1962 | $233,401 | NA |
4 | Melvin Elementary | Eating Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1954 | $67,038 | NA |
4 | Monroe Senior High | Classroom/Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,217,582 | NA |
4 | Monroe Senior High | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,619,678 | In Design |
4 | Monroe Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $2,532,132 | NA |
4 | Mulholland Middle School | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1963 | $525,074 | NA |
4 | Mulholland Middle School | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1961 | $1,630,801 | NA |
4 | Mulholland Middle School | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1961 | $1,770,910 | NA |
4 | Noble Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1955 | $83,982 | NA |
4 | Northridge Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $1,154,284 | NA |
4 | Northridge Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $1,462,757 | NA |
4 | Parkman Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1959 | $2,394,173 | NA |
4 | Parthenia Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1968 | $83,982 | NA |
3 | Porter Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,060,103 | NA |
3 | Porter Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,589,214 | NA |
3 | Porter Middle School | Library | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $360,478 | NA |
4 | Portola Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1960 | $1,236,892 | NA |
4 | Portola Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1960 | $1,643,868 | NA |
3 | Ranchito Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1953 | $69,285 | NA |
3 | Ranchito Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1953 | $83,982 | NA |
4 | Reseda Senior High | Library | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $355,808 | NA |
4 | Reseda Senior High | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $837,026 | NA |
4 | Reseda Senior High | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,971,024 | NA |
4 | Reseda Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $992,832 | NA |
4 | Reseda Senior High | Cafeteria | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $713,358 | NA |
4 | Reseda Senior High | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $653,406 | NA | |
4 | Reseda Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,668,615 | NA |
4 | Reseda Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $418,966 | NA |
3 | Sepulveda Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1959 | $452,719 | NA |
3 | Sepulveda Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1959 | $1,310,298 | NA |
3 | Sepulveda Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1959 | $1,681,548 | NA |
4 | SOCES Mag | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $974,358 | NA |
4 | SOCES Mag | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1953 | $1,558,611 | NA |
4 | Sutter Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1951 | $1,236,683 | NA |
4 | Sutter Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,607,130 | NA |
4 | Taft Senior High | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1960 | $1,631,717 | NA |
4 | Taft Senior High | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1960 | $1,492,876 | NA |
2 | Brainard Elementary | Multi-Purpose | Mixed construction containing a combination of two or more of the other structure types defined | 1966 | $384,773 | NA |
2 | Brainard Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1966 | $967,519 | NA |
2 | Byrd Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1959 | $1,646,981 | NA |
3 | Camellia Elementary | Eating Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1950 | $67,038 | NA |
3 | Canterbury Elementary | Eating Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1950 | $67,038 | NA |
2 | Carpenter Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1938 | $1,019,531 | NA |
2 | Carpenter Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1958 | $83,982 | NA |
3 | Fair Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1955 | $83,982 | NA |
4 | Fulton College Prep | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1956 | $1,713,719 | NA |
4 | Fulton College Prep | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1956 | $1,600,786 | NA |
4 | Fulton College Prep | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $1,092,868 | NA |
4 | Grant Senior High | Library | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $534,091 | NA |
4 | Grant Senior High | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $600,306 | NA |
4 | Grant Senior High | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $1,421,307 | NA |
4 | Grant Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1959 | $2,774,275 | NA |
4 | Grant Senior High | Manual Arts | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $729,426 | NA |
4 | Grant Senior High | Manual Arts | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $384,331 | NA |
4 | Grant Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1959 | $1,060,151 | NA |
4 | Grant Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1959 | $3,356,043 | NA |
3 | Lankershim Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1912 | $755,743 | NA |
2 | Maclay Middle School | Athletic Facility | Precast tilt-up concrete shear wall with concrete floor and roof diaphragms | 1960 | $1,663,209 | NA |
4 | Madison Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,013,188 | NA |
4 | Madison Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1955 | $1,553,547 | NA |
3 | Millikan Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,642,752 | NA |
2 | Morningside Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1915 | $2,432,360 | NA |
2 | Mount Gleason Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,707,305 | NA |
2 | Mount Gleason Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,649,096 | NA |
2 | Mount Gleason Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1958 | $1,500,405 | NA |
2 | Mount Gleason Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1958 | $1,844,605 | NA |
2 | Mount Gleason Middle School | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1958 | $972,592 | NA |
3 | No Hollywood Senior High | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $4,655,476 | NA |
3 | No Hollywood Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $1,510,740 | NA |
3 | No Hollywood Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1950 | $2,136,013 | NA |
3 | No Hollywood Senior High | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $652,291 | NA |
3 | No Hollywood Senior High | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $1,616,611 | NA |
3 | No Hollywood Senior High | Library | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $528,901 | NA |
3 | No Hollywood Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,791,726 | NA |
2 | No Valley Occ Cntr | Manual Arts | Steel light frame with metal siding and/or rod bracing | 1972 | $315,909 | NA |
2 | No Valley Occ Cntr | Manual Arts | Steel light frame with metal siding and/or rod bracing | 1976 | $876,215 | NA |
1 | Olive Vista Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,108,315 | In Design |
1 | Olive Vista Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1958 | $1,657,526 | In Design |
2 | Pacoima Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,594,512 | NA |
2 | Pacoima Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,151,495 | NA |
3 | Polytechnic Senior High | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1956 | $675,750 | NA |
3 | Polytechnic Senior High | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1959 | $1,435,221 | NA |
3 | Polytechnic Senior High | Library | Mixed construction containing a combination of two or more of the other structure types defined | 1957 | $503,347 | NA |
3 | Polytechnic Senior High | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $1,968,782 | NA |
3 | Polytechnic Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1956 | $1,856,497 | NA |
3 | Polytechnic Senior High | Cafeteria | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1956 | $757,462 | NA |
3 | Polytechnic Senior High | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $1,196,456 | NA |
3 | Reed Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1939 | $1,644,356 | NA |
3 | Reed Middle School | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1939 | $2,485,007 | NA |
2 | Rio Vista Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1938 | $945,567 | NA |
2 | Roscoe Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1939 | $1,068,745 | NA |
2 | San Fernando Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $322,695 | NA |
2 | San Fernando Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,077,880 | In Design |
2 | San Fernando Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1916 | $1,913,163 | NA |
2 | San Fernando Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1975 | $1,425,685 | NA |
2 | San Fernando Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1916 | $1,534,212 | NA |
2 | San Fernando Middle School | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1916 | $953,654 | NA |
3 | San Fernando Senior High | Manual Arts | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1951 | $1,739,775 | NA |
3 | San Fernando Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1951 | $3,156,255 | NA |
3 | San Fernando Senior High | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1956 | $1,726,825 | NA |
3 | Sun Valley Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $996,526 | NA |
3 | Sun Valley Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $1,285,760 | NA |
3 | Sun Valley Middle School | Cafeteria | Mixed construction containing a combination of two or more of the other structure types defined | 1949 | $937,281 | NA |
2 | Sylmar Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1960 | $2,745,016 | NA |
2 | Sylmar Senior High | Auditorium | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1960 | $1,284,650 | NA |
4 | Van Nuys Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,173,454 | NA |
4 | Van Nuys Middle School | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1948 | $705,272 | NA |
4 | Van Nuys Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1962 | $1,828,603 | NA |
2 | Verdugo Hills Senior High | Classroom | Concrete frame with infill masonry shear walls and flexible floor and roof diaphragms | 1962 | $1,398,413 | NA |
2 | Verdugo Hills Senior High | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1956 | $1,469,679 | NA |
3 | Victory Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1953 | $83,982 | NA |
3 | Victory Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1975 | $103,228 | NA |
3 | 24th St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,678,445 | NA |
3 | 42nd St Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,940,142 | NA |
2 | 54th St Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $2,502,505 | NA |
2 | 59th St Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $2,535,897 | NA |
3 | 6th Ave Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $2,534,433 | NA |
3 | 6th Ave Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $323,462 | NA |
2 | 74th St Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1977 | $3,383,890 | NA |
3 | Alta Loma Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1936 | $286,933 | NA |
2 | Angeles Mesa Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1917 | $1,724,036 | NA |
3 | Arlington Hts Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $2,513,450 | NA |
1 | Audubon Middle School | Eating Facility | Concrete moment frames | 1972 | $812,416 | In Design |
2 | Audubon Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1974 | $7,769,041 | NA |
2 | Audubon Middle School | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1974 | $752,038 | NA |
2 | Audubon Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1974 | $1,722,305 | NA |
2 | Audubon Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1974 | $218,088 | NA |
2 | Audubon Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1974 | $201,605 | NA |
2 | Audubon Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1953 | $1,836,132 | NA |
2 | Audubon Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1974 | $991,577 | NA |
2 | Audubon Middle School | Other | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1974 | $356,577 | NA |
3 | Bradley Env/Human Mg | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,301,584 | NA |
2 | Brentwood Sci Mag | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1929 | $1,399,250 | NA |
4 | Broadway Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1936 | $1,599,314 | NA |
2 | Brockton Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $1,992,774 | NA |
3 | Burroughs Middle School | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $4,697,233 | NA |
3 | Burroughs Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $827,337 | NA |
3 | Burroughs Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,988,800 | NA |
3 | Burroughs Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $629,635 | NA |
2 | Cienega Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,344,457 | Complete |
1 | Crenshaw Senior High | Eating Facility | Concrete moment frames | 1966 | $813,712 | In Design |
2 | Crenshaw Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1968 | $2,937,087 | NA |
2 | Crenshaw Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1968 | $1,862,762 | NA |
2 | Crenshaw Senior High | Multi-Purpose | Mixed construction containing a combination of two or more of the other structure types defined | 1968 | $1,140,352 | NA |
2 | Crescent Hts Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $258,700 | NA |
2 | Dorsey Senior High | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $695,303 | NA |
2 | Dorsey Senior High | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1938 | $1,399,599 | NA |
2 | Hamilton Senior High-Complex | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1961 | $1,865,272 | NA |
2 | Hamilton Senior High-Complex | Classroom | Precast tilt-up concrete shear wall with concrete floor and roof diaphragms | 1958 | $1,723,579 | NA |
2 | Hamilton Senior High-Complex | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1958 | $119,273 | NA |
2 | Hamilton Senior High-Complex | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1936 | $1,293,358 | NA |
2 | Hamilton Senior High-Complex | Assembly | Concrete shear wall with flexible floor and roof diaphragms | 1936 | $1,132,673 | NA |
2 | Hamilton Senior High-Complex | Cafeteria | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1974 | $934,553 | NA |
2 | Hyde Park Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $287,560 | NA |
2 | Laces Mag | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $435,697 | NA |
3 | Los Angeles Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1967 | $4,842,163 | NA |
3 | Los Angeles Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1978 | $9,748,810 | NA |
3 | Los Angeles Senior High | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1976 | $4,821,250 | NA |
3 | M&O Dist 3 Frce Acct | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1955 | $901,586 | NA |
2 | Mann Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $1,057,602 | NA |
2 | Mann Middle School | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $7,648,332 | NA |
2 | Mann Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $865,748 | NA |
4 | Marina Del Rey Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1960 | $1,669,870 | NA |
4 | Marina Del Rey Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1960 | $1,352,404 | NA |
4 | Mark Twain Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1954 | $1,538,184 | NA |
4 | Mark Twain Middle School | Cafeteria | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $729,252 | NA |
4 | Mark Twain Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $1,052,644 | NA |
4 | Mark Twain Middle School | Eating Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1960 | $175,976 | NA |
4 | Marvin Es | Classroom | Gnite shear wall with conc lift slabs | 1963 | $2,124,980 | Evaluated |
3 | Mid-City Magnet | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1945 | $816,473 | NA |
3 | Mount Vernon Middle School | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1978 | $1,721,531 | NA |
3 | Mount Vernon Middle School | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1978 | $4,315,625 | NA |
3 | Mount Vernon Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1978 | $1,281,901 | NA |
3 | Mount Vernon Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1978 | $371,505 | NA |
3 | Overland Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1938 | $1,007,471 | NA |
2 | Pacific Palisades Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1931 | $1,462,757 | NA |
2 | Palisades Chrtr Senior High | Classroom/Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1961 | $1,470,405 | NA |
2 | Palisades Chrtr Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1961 | $1,208,368 | NA |
2 | Palisades Chrtr Senior High | Other | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1961 | $61,778 | NA |
3 | Palms Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $1,352,962 | NA |
3 | Palms Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $624,615 | NA |
3 | Palms Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $271,457 | NA |
3 | Palms Middle School | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $4,513,822 | NA |
3 | Palms Middle School | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $796,942 | NA |
3 | Palms Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1957 | $1,141,178 | NA |
3 | Palms Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $445,248 | NA |
3 | Palms Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $1,279,834 | NA |
3 | Pio Pico Elementary | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1955 | $733,935 | NA |
3 | Pio Pico Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1958 | $552,265 | NA |
2 | Revere Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,516,505 | NA |
2 | Revere Middle School | Eating Facility | Steel cantilever columns with wood roofs | 1954 | $804,392 | NA |
2 | Revere Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,073,070 | NA |
2 | Saturn Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1935 | $1,262,685 | NA |
2 | Shenandoah Elementary | Classroom/Assembly | Concrete shear wall with flexible floor and roof diaphragms | 1940 | $886,103 | NA |
2 | Sterry Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1940 | $825,016 | NA |
3 | Topanga Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1953 | $169,061 | Evaluated |
3 | Topanga Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1953 | $379,330 | Evaluated |
3 | Topanga Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1953 | $378,344 | Evaluated |
3 | Topanga Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1955 | $243,095 | Evaluated |
3 | Topanga Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1955 | $371,088 | Evaluated |
2 | University Senior High | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1977 | $2,149,536 | Complete |
2 | University Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1978 | $1,727,166 | NA |
2 | University Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1978 | $224,005 | NA |
2 | University Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1978 | $1,108,333 | NA |
2 | University Senior High | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1924 | $5,263,633 | NA |
1 | Venice Senior High | Eating Facility | Reinforced concrete cantilever columns with wood roofs | 1940 | $898,663 | In Design |
4 | Venice Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,102,488 | NA |
4 | Venice Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1951 | $2,485,870 | NA |
4 | Venice Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1935 | $871,952 | NA |
3 | Virginia Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1924 | $1,263,024 | NA |
3 | Webster Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $971,779 | NA |
3 | Webster Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1954 | $1,489,457 | NA |
4 | Westchester Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1956 | $1,554,734 | NA |
4 | Westchester Senior High | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1956 | $473,272 | NA |
4 | Westchester Senior High | Manual Arts | Concrete shear wall with flexible floor and roof diaphragms | 1956 | $471,389 | NA |
4 | Westchester Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1976 | $236,685 | NA |
3 | Western Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $318,791 | NA |
4 | Westminster Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1966 | $146,731 | NA |
1 | Widney Senior High | Cantilever concrete columns | 1965 | $201,506 | In Design | |
3 | Wilshire Crest Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,552,337 | NA |
4 | Wilton Pl Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $1,474,469 | NA |
4 | Wilton Pl Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,157,142 | NA |
4 | Wright Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1951 | $302,860 | NA |
4 | Wright Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1957 | $1,270,353 | NA |
4 | Wright Middle School | Cafeteria | Concrete shear wall with flexible floor and roof diaphragms | 1951 | $710,082 | NA |
4 | Wright Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1951 | $759,019 | NA |
4 | Wright Middle School | Concrete shear wall with flexible floor and roof diaphragms | 1951 | $374,978 | NA | |
4 | 10th St Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $1,509,813 | NA |
2 | Aldama Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1923 | $2,218,851 | NA |
3 | Alexandria Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $2,457,959 | NA |
3 | Aragon Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1925 | $2,254,889 | NA |
3 | Aragon Elementary | Eating Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1940 | $67,667 | Complete |
2 | Bancroft Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1969 | $3,664,001 | NA |
2 | Bancroft Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $2,810,099 | NA |
2 | Bancroft Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1929 | $910,014 | NA |
4 | Belmont Senior High | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $3,555,358 | NA |
4 | Belmont Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1940 | $1,263,034 | NA |
4 | Berendo Middle School | Eating Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1969 | $410,820 | NA |
4 | Berendo Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $707,851 | NA |
4 | Berendo Middle School | Cafeteria | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $291,338 | NA |
4 | Berendo Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $1,067,981 | NA |
4 | Berendo Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1977 | $1,268,307 | NA |
4 | Berendo Middle School | Other | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $111,862 | NA |
2 | Buchanan Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $267,901 | NA |
2 | Burbank Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $765,224 | NA |
3 | Bushnell Way Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1935 | $1,469,798 | NA |
3 | Bushnell Way Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1974 | $898,769 | NA |
3 | Cahuenga Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $1,256,481 | NA |
3 | Carthay Center Elementary | Classroom/Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $3,251,555 | NA |
4 | Castelar Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $2,341,262 | Complete |
2 | Cheremoya Elementary | Classroom/Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $3,163,579 | NA |
3 | Dayton Heights Elementary | Classroom/Assembly | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $911,688 | NA |
3 | Dorris Place Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1928 | $1,421,025 | NA |
4 | Downtwn Business Mag | Classroom/Admin | Precast tilt-up concrete shear wall with concrete floor and roof diaphragms | 1961 | $7,189,848 | NA |
2 | Eagle Rock Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1917 | $3,405,548 | NA |
2 | Eagle Rock Hs | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1977 | $1,015,349 | NA |
2 | Eagle Rock Hs | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1957 | $1,844,047 | NA |
2 | Eagle Rock Hs | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $1,233,894 | NA |
2 | Fairfax Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1968 | $2,268,204 | NA |
2 | Fairfax Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1968 | $2,816,276 | NA |
2 | Fairfax Senior High | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1968 | $2,698,787 | NA |
2 | Fletcher Dr Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1927 | $67,973 | NA |
2 | Franklin Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $2,011,666 | NA |
2 | Franklin Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1968 | $1,506,118 | NA |
2 | Franklin Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,132,813 | Complete |
2 | Franklin Senior High | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $2,862,286 | Complete |
4 | Friedman Occ Ctr | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1926 | $13,510,275 | NA |
2 | Gardner Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1921 | $1,634,317 | NA |
2 | Garvanza Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $2,526,067 | NA |
2 | Glassell Park Elementary | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $2,249,591 | NA |
2 | Grant Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $2,223,101 | NA |
2 | Hollywood Senior High | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1925 | $4,373,772 | NA |
2 | Hollywood Senior High | Other | Mixed construction containing a combination of two or more of the other structure types defined | 1967 | $103,141 | NA |
1 | Irving Middle School | Manual Arts | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $416,423 | Complete |
2 | Irving Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $1,139,226 | NA |
2 | Irving Middle School | Classroom/Assembly | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $1,054,666 | NA |
2 | Irving Middle School | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $3,882,166 | NA |
2 | King Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,196,738 | NA |
2 | King Middle School | Auditorium | Precast tilt-up concrete shear wall with concrete floor and roof diaphragms | 1967 | $892,635 | NA |
2 | Laurel Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1975 | $223,953 | NA |
2 | Le Conte Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1923 | $1,734,562 | NA |
2 | Le Conte Middle School | Classroom/Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1922 | $4,873,666 | NA |
2 | Le Conte Middle School | Manual Arts | Concrete frame with infill masonry shear walls and flexible floor and roof diaphragms | 1937 | $517,326 | NA |
2 | Le Conte Middle School | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1920 | $1,161,376 | NA |
3 | Lockwood Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $800,288 | NA |
3 | Logan Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $2,083,120 | NA |
2 | Los Feliz Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $315,863 | NA |
4 | Magnolia Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1975 | $2,276,824 | NA |
2 | Marshall Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1934 | $2,183,365 | NA |
2 | Marshall Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1931 | $804,541 | NA |
3 | Melrose Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,535,885 | NA |
3 | Micheltorena Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $2,465,279 | NA |
4 | Plasencia Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $2,605,608 | NA |
3 | Ramona Elementary | Auditorium | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1924 | $319,525 | NA |
3 | Rosemont Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $2,957,582 | NA |
2 | Rosewood Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1926 | $3,015,055 | NA |
4 | Union Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $1,888,207 | NA |
3 | Van Ness Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,626,231 | NA |
3 | Van Ness Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $255,563 | NA |
2 | Vine Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $2,676,226 | NA |
2 | Vine Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $327,784 | NA |
1 | Virgil Middle School | Athletic Facility | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1978 | $1,635,068 | Complete |
3 | Virgil Middle School | Classroom/Cafeteria | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,727,661 | NA |
3 | Virgil Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,109,389 | NA |
3 | Virgil Middle School | Classroom/Parking | Precast tilt-up concrete shear wall with concrete floor and roof diaphragms | 1978 | $960,369 | NA |
2 | West Hollywood Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $3,242,981 | NA |
2 | West Hollywood Elementary | Eating Facility | Steel cantilever columns with wood roofs | 1958 | $83,982 | NA |
2 | Yorkdale Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,492,594 | NA |
1 | 1st St Elementary | Concrte frame at garage entry, balance is C2 | 1975 | $2,147,059 | In Design | |
4 | 1st St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $759,786 | NA |
4 | 28th St Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $3,093,519 | NA |
4 | 28th St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1968 | $1,048,043 | NA |
4 | 2nd St Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,744,950 | NA |
4 | 2nd St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $2,035,159 | NA |
4 | 49th St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $421,755 | NA |
4 | 49th St Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1936 | $306,452 | NA |
4 | 4th St Elementary | Auditorium | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1938 | $958,433 | NA |
4 | Adams Middle School | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1927 | $4,058,481 | NA |
4 | Albion Elementary | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1926 | $266,967 | NA |
4 | Albion Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $1,422,882 | NA |
4 | Albion Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $998,827 | NA |
4 | Ascot Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $1,222,614 | NA |
4 | Ascot Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1977 | $1,427,081 | NA |
4 | Belvedere Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1929 | $1,240,726 | NA |
4 | Belvedere Middle School | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1924 | $3,750,453 | NA |
4 | Belvedere Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1924 | $937,072 | NA |
4 | Belvedere Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1929 | $568,288 | NA |
4 | Belvedere Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1951 | $2,329,237 | NA |
4 | Belvedere Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $1,423,031 | NA |
4 | Belvedere Middle School | Classroom/Library | Mixed construction containing a combination of two or more of the other structure types defined | 1970 | $3,860,927 | NA |
4 | Breed Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $2,674,692 | NA |
4 | Bridge Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $1,173,594 | NA |
4 | Bridge Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1924 | $1,901,728 | NA |
4 | Bsd-Adm Off-Soto St | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1972 | $5,696,060 | NA |
4 | Carver Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1933 | $651,733 | NA |
4 | Carver Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $705,300 | NA |
4 | Carver Middle School | Classroom/Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1923 | $5,207,422 | NA |
4 | Dena Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $303,245 | NA |
4 | Eastman Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,846,659 | NA |
4 | Eastman Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,558,680 | NA |
4 | Eastman Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1966 | $890,355 | NA |
4 | Eastman Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1966 | $786,585 | NA |
3 | El Sereno Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1962 | $599,366 | NA |
3 | El Sereno Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1941 | $929,673 | NA |
4 | Evergreen Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $580,791 | NA |
4 | Evergreen Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1965 | $2,801,219 | NA |
4 | Ford Blvd Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,202,454 | NA |
4 | Ford Blvd Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1939 | $1,929,660 | NA |
4 | Garfield Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $2,112,270 | NA |
4 | Garfield Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $4,086,343 | Complete |
4 | Garfield Senior High | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1967 | $2,669,468 | NA |
4 | Garfield Senior High | Multi-Purpose | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $764,657 | NA |
4 | Garfield Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $3,341,937 | NA |
4 | Garfield Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1967 | $2,383,078 | NA |
4 | Garfield Senior High | Library | Mixed construction containing a combination of two or more of the other structure types defined | 1975 | $2,396,974 | NA |
4 | Griffin Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,477,188 | NA |
4 | Hamasaki Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1927 | $2,657,935 | NA |
4 | Hammel Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1923 | $1,403,548 | NA |
4 | Hammel Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1935 | $811,094 | NA |
4 | Hammel Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1961 | $807,185 | NA |
4 | Hammel Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1973 | $2,130,147 | NA |
4 | Harrison Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1975 | $1,088,469 | NA |
4 | Harrison Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1975 | $597,489 | NA |
4 | Harrison Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1975 | $597,700 | NA |
4 | Harrison Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1975 | $559,309 | NA |
4 | Harrison Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1975 | $540,431 | NA |
3 | Hillside Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $1,097,957 | NA |
4 | Hollenbeck Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $873,207 | NA |
4 | Hollenbeck Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $1,265,474 | NA |
4 | Hooper Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $355,529 | NA |
4 | Hooper Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1976 | $632,146 | NA |
4 | Hooper Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1976 | $2,557,727 | NA |
4 | Humphreys Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1925 | $1,647,284 | NA |
4 | Humphreys Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $250,543 | Complete |
1 | Jefferson Senior High | Classroom | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1959 | $1,287,535 | Complete |
4 | Jefferson Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1936 | $4,012,811 | NA |
4 | Jefferson Senior High | Multi-Purpose | Mixed construction containing a combination of two or more of the other structure types defined | 1936 | $697,270 | NA |
4 | Jefferson Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,752,757 | NA |
4 | Jefferson Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1957 | $1,056,897 | NA |
4 | Jefferson Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1938 | $725,070 | NA |
4 | Jefferson Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1970 | $4,172,167 | NA |
4 | Kennedy Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1971 | $663,681 | NA |
4 | Kennedy Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1971 | $606,294 | NA |
4 | Lincoln Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $4,823,976 | NA |
4 | Lincoln Senior High | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $1,210,463 | NA |
4 | Lincoln Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $3,295,639 | NA |
4 | Lincoln Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1941 | $2,508,291 | NA |
4 | Lincoln Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1976 | $2,663,662 | NA |
4 | Lorena Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1925 | $864,911 | NA |
4 | Lorena Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,308,416 | NA |
4 | Main St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $1,337,625 | NA |
4 | Main St Elementary | Cafeteria | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1977 | $466,044 | NA |
4 | Malabar Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,038,493 | NA |
4 | Malabar Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $1,705,911 | NA |
4 | Metropolitan Hs | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $813,743 | NA |
4 | Murchison Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1956 | $973,943 | NA |
4 | Murchison Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1925 | $1,249,300 | NA |
4 | Nevin Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1921 | $2,525,022 | NA |
4 | Ramona Hs | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1927 | $159,903 | NA |
4 | Roosevelt Senior High | Classroom/Assembly | Mixed construction containing a combination of two or more of the other structure types defined | 1922 | $7,560,681 | NA |
4 | Roosevelt Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1968 | $1,783,921 | NA |
4 | Roosevelt Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1968 | $2,709,401 | NA |
4 | Roosevelt Senior High | Other | Steel light frame with metal siding and/or rod bracing | 1975 | $45,549 | NA |
4 | San Pedro Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $1,911,212 | NA |
4 | Sheridan St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1921 | $1,596,534 | NA |
4 | Sheridan St Elementary | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1924 | $1,694,886 | NA |
3 | Solano Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,375,478 | NA |
4 | Soto Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $2,001,837 | NA |
4 | Stevenson Middle School | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1958 | $5,374,790 | NA |
4 | Stevenson Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1958 | $1,478,788 | NA |
4 | Sunrise Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1978 | $392,291 | NA |
1 | Bell Senior High | Classroom | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1960 | $462,817 | Complete |
4 | Bell Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $525,695 | NA |
4 | Bell Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1936 | $501,811 | NA |
4 | Bell Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1978 | $2,293,833 | NA |
4 | Gage Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1949 | $1,162,579 | NA |
4 | Gage Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1960 | $540,847 | NA |
4 | Gage Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1964 | $1,246,008 | NA |
4 | Heliotrope Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,742,719 | NA |
4 | Holmes Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $1,436,615 | NA |
4 | Holmes Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1969 | $2,431,608 | NA |
4 | Huntington Park Adlt | Classroom | Steel light frame with metal siding and/or rod bracing | 1970 | $307,913 | NA |
1 | Huntington Park Senior High | Classroom | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1960 | $890,524 | Complete |
1 | Huntington Park Senior High | Classroom | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1960 | $998,870 | Complete |
4 | Huntington Park Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1936 | $2,819,805 | NA |
4 | Huntington Park Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,466,173 | NA |
4 | Huntington Park Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $1,520,586 | NA |
4 | Huntington Park Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1923 | $3,556,670 | NA |
4 | Liberty Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $324,089 | NA |
4 | Liberty Elementary | Classroom/Cafeteria | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1977 | $973,367 | NA |
4 | Lillian Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $914,337 | NA |
4 | Miles Eec | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1977 | $465,534 | NA |
4 | Miles Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $350,231 | NA |
4 | Nimitz Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1966 | $2,989,287 | NA |
4 | San Gabriel Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $318,373 | NA |
4 | South Gate Middle School | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1941 | $2,419,548 | NA |
4 | South Gate Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1941 | $2,071,827 | NA |
4 | South Gate Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1941 | $1,283,250 | NA |
4 | South Gate Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $895,173 | NA |
4 | South Gate Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,859,416 | NA |
4 | South Gate Senior High | Multi-Purpose | Mixed construction containing a combination of two or more of the other structure types defined | 1930 | $671,292 | NA |
4 | State Eec | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1931 | $412,204 | NA |
4 | State Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1926 | $2,021,210 | NA |
4 | State Elementary | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $340,849 | NA |
4 | Vernon City Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1929 | $1,310,925 | NA |
4 | Victoria Elementary | Assembly | Mixed construction containing a combination of two or more of the other structure types defined | 1929 | $329,955 | NA |
2 | 107th St Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1962 | $1,094,962 | NA |
2 | 107th St Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1962 | $140,781 | NA |
3 | 109th St Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1940 | $932,651 | NA |
3 | 112th St Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1960 | $1,167,936 | NA |
3 | 112th St Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1960 | $1,145,590 | NA |
2 | 118th St Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $2,778,214 | NA |
3 | 52nd St Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $1,322,637 | NA |
3 | 66th St Elementary | Library | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $1,466,800 | NA |
4 | 92nd St Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1940 | $1,186,383 | NA |
3 | 99th St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,340,274 | NA |
2 | Barrett Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $2,907,041 | NA |
3 | Bethune Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1927 | $3,409,325 | NA |
3 | Bethune Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $1,129,188 | NA |
3 | Bethune Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1968 | $2,754,862 | NA |
3 | Bethune Middle School | Library | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1968 | $394,686 | NA |
3 | Bethune Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1968 | $165,820 | NA |
3 | Bethune Middle School | Other | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1966 | $58,889 | NA |
3 | Drew Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1963 | $2,240,599 | NA |
3 | Drew Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1963 | $2,167,889 | NA |
3 | Drew Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $1,652,708 | NA |
4 | Edison Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1926 | $652,159 | NA |
4 | Edison Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1932 | $1,353,728 | NA |
2 | Figueroa Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1925 | $1,892,738 | NA |
3 | Flournoy Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1972 | $2,936,459 | NA |
1 | Foshay LC | Concrete shear wall 1F, Moment frame 2FL, with rigid floor & roof diaphragms | 1961 | $2,581,937 | In Design | |
1 | Foshay LC | Cantilever concrete columns | 1961 | $758,917 | In Design | |
3 | Foshay LC | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $4,173,490 | NA |
3 | Foshay LC | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $2,610,279 | NA |
3 | Foshay LC | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $510,010 | NA |
3 | Foshay LC | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $167,796 | NA |
3 | Foshay LC | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $901,788 | NA |
3 | Foshay LC | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1968 | $2,355,204 | NA |
3 | Fremont Senior High | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,992,913 | NA |
3 | Fremont Senior High | Other | Mixed construction containing a combination of two or more of the other structure types defined | 1968 | $58,449 | NA |
3 | Fremont Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $2,787,054 | NA |
3 | Fremont Senior High | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1968 | $1,555,076 | NA |
3 | Fremont Senior High | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1976 | $1,157,361 | NA |
2 | Gompers Middle School | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $2,103,755 | NA |
4 | Graham Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $2,045,860 | NA |
3 | Griffith Joyner Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $1,478,477 | NA |
4 | Jordan Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1929 | $1,566,675 | NA |
4 | Jordan Senior High | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $986,349 | NA |
4 | Jordan Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $1,488,411 | In Design |
4 | Jordan Senior High | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1958 | $436,529 | NA |
4 | Jordan Senior High | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1970 | $2,104,664 | NA |
4 | Lanterman High School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1983 | $1,309,252 | NA |
2 | Locke Senior High | Classroom/Library | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1967 | $636,443 | NA |
2 | Locke Senior High | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1967 | $836,639 | NA |
2 | Locke Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1967 | $11,069,866 | NA |
2 | Locke Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1967 | $2,157,661 | NA |
2 | Locke Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1967 | $3,007,373 | NA |
2 | Locke Senior High | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1967 | $1,258,938 | NA |
2 | Manchester Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,332,257 | NA |
2 | Manchester Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1923 | $789,518 | NA |
3 | Manual Arts Senior High | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1968 | $1,644,007 | NA |
3 | Markham Middle School | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $175,260 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $173,569 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $205,127 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $291,911 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $110,453 | NA |
3 | Markham Middle School | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $94,674 | NA |
3 | Markham Middle School | Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $189,348 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $236,685 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $252,464 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $157,790 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $315,580 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $331,359 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $315,580 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $275,428 | NA |
3 | Markham Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1957 | $449,779 | NA |
3 | Markham Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1957 | $480,243 | NA |
3 | Markham Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1957 | $1,659,970 | NA |
3 | Markham Middle School | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $205,127 | NA |
3 | Markham Middle School | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1957 | $1,087,221 | NA |
3 | Markham Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1957 | $292,788 | NA |
3 | Markham Middle School | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1957 | $755,772 | NA |
3 | Mc Kinley Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1925 | $1,550,036 | NA |
3 | Mc Kinley Elementary | Classroom/Assembly | Concrete shear wall with flexible floor and roof diaphragms | 1929 | $539,149 | NA |
3 | Mc Kinley Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1929 | $727,022 | NA |
3 | Muir Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,218,000 | NA |
3 | Normandie Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $525,344 | NA |
3 | Ritter Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1932 | $1,425,531 | NA |
3 | South Park Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1936 | $710,639 | NA |
3 | South Park Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1936 | $927,651 | NA |
3 | South Park Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $343,190 | NA |
3 | Weemes Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1924 | $1,063,868 | NA |
3 | Weemes Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1937 | $771,916 | NA |
3 | Weemes Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $1,675,673 | NA |
3 | 15th St Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1923 | $2,256,263 | NA |
3 | 15th St Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,474,469 | NA |
3 | Bandini Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1923 | $1,343,074 | NA |
3 | Bandini Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1977 | $1,110,185 | NA |
2 | Banneker Sp Ed Ctr | Other | Concrete shear wall with flexible floor and roof diaphragms | 1972 | $27,885 | NA |
3 | Banning Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $3,537,187 | NA |
3 | Banning Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1975 | $2,681,399 | NA |
3 | Banning Senior High | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1975 | $1,471,471 | NA |
2 | Barton Hill Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1923 | $2,995,292 | NA |
2 | Barton Hill Elementary | Classroom/Admin | Concrete shear wall with flexible floor and roof diaphragms | 1923 | $681,151 | NA |
3 | Broad Ave Elementary | Classroom/Admin | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $324,033 | NA |
3 | Broad Ave Elementary | Multi-Purpose | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $469,002 | NA |
3 | Broad Ave Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $1,484,212 | NA |
3 | Broad Ave Elementary | Classroom | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1969 | $980,340 | NA |
3 | Cabrillo Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1927 | $2,873,157 | NA |
3 | Cabrillo Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1972 | $940,983 | NA |
3 | Carnegie Middle School | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1965 | $599,226 | NA |
3 | Carnegie Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1965 | $647,061 | NA |
3 | Carnegie Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1965 | $629,812 | NA |
3 | Carnegie Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1965 | $629,812 | NA |
3 | Carnegie Middle School | Classroom/Multi-Purpose | Mixed construction containing a combination of two or more of the other structure types defined | 1965 | $1,559,971 | NA |
3 | Carnegie Middle School | Athletic Facility | Reinforced masonry bearing wall with flexible floor and roof diaphragms | 1965 | $1,763,303 | NA |
4 | Carson Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1927 | $1,392,026 | NA |
1 | Carson Senior High | Athletic Facility | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1962 | $2,961,428 | Complete |
3 | Catskill Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1963 | $147,928 | NA |
2 | Clay Middle School | Athletic Facility | Concrete shear wall with flexible floor and roof diaphragms | 1958 | $1,685,276 | NA |
3 | Dana Middle School | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1928 | $7,174,023 | NA |
3 | Dana Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1955 | $1,085,395 | NA |
2 | Dodson Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1960 | $1,762,274 | NA |
2 | Dodson Middle School | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1960 | $1,241,075 | NA |
2 | Eshelman Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $1,620,585 | NA |
2 | Fleming Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $396,644 | NA |
2 | Fleming Middle School | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $4,686,407 | NA |
2 | Fleming Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1936 | $444,269 | NA |
2 | Fleming Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1961 | $2,855,699 | NA |
3 | Fries Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1924 | $1,563,113 | NA |
3 | Fries Elementary | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $1,096,358 | NA |
3 | Gardena Elementary | Classroom | Steel light frame with metal siding and/or rod bracing | 1963 | $354,929 | NA |
1 | Gardena Senior High | Classroom/Admin | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,208,273 | Complete |
1 | Gardena Senior High | Auditorium | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,557,909 | Complete |
1 | Gardena Senior High | Classroom | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,006,649 | Complete |
1 | Gardena Senior High | Multi-Purpose | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $750,431 | Complete |
1 | Gardena Senior High | Other | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $57,607 | Complete |
1 | Gardena Senior High | Athletic Facility | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,002,654 | Complete |
1 | Gardena Senior High | Athletic Facility | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $1,647,473 | Complete |
1 | Gardena Senior High | Classroom | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1955 | $451,815 | Complete |
3 | Gardena Senior High | Classroom | Steel light frame with metal siding and/or rod bracing | 1955 | $547,451 | NA |
3 | Gulf Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1926 | $1,717,302 | NA |
3 | Gulf Elementary | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1926 | $255,863 | NA |
3 | Gulf Elementary | Administrative | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $181,772 | NA |
3 | Gulf Elementary | Library | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $144,552 | NA |
3 | Gulf Elementary | Cafeteria | Mixed construction containing a combination of two or more of the other structure types defined | 1963 | $281,212 | NA |
2 | Harbor Occ Cntr | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1974 | $982,183 | NA |
2 | Harbor Occ Cntr | Classroom | Steel light frame with metal siding and/or rod bracing | 1976 | $63,162 | NA |
2 | Harbor Occ Cntr | Classroom | Steel light frame with metal siding and/or rod bracing | 1980 | $33,605 | NA |
2 | Harte Prep Middle School | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1972 | $5,120,272 | NA |
2 | Harte Prep Middle School | Assembly | Concrete shear wall with flexible floor and roof diaphragms | 1929 | $945,010 | NA |
2 | Harte Prep Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1931 | $1,029,500 | NA |
2 | Harte Prep Middle School | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1960 | $1,125,548 | NA |
2 | Harte Prep Middle School | Other | Mixed construction containing a combination of two or more of the other structure types defined | 1972 | $133,937 | NA |
1 | Manhattan Elementary | Classroom | Precast tilt-up concrete shear wall with flexible floor and roof diaphragms | 1969 | $1,511,725 | Complete |
2 | Narbonne Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1957 | $1,016,610 | NA |
2 | Narbonne Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1957 | $1,716,534 | NA |
2 | Narbonne Senior High | Multi-Purpose | Concrete shear wall with flexible floor and roof diaphragms | 1957 | $972,615 | NA |
2 | Narbonne Senior High | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1958 | $1,281,971 | NA |
3 | Peary Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1922 | $2,004,974 | NA |
3 | Peary Middle School | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1927 | $1,498,101 | NA |
3 | Point Fermin Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1921 | $1,615,976 | NA |
3 | Point Fermin Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $997,127 | NA |
2 | Raymond Ave Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1922 | $3,802,687 | NA |
3 | San Pedro Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1936 | $1,278,828 | NA |
3 | San Pedro Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $1,276,803 | NA |
3 | San Pedro Senior High | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $3,517,773 | NA |
3 | San Pedro Senior High | Athletic Facility | Mixed construction containing a combination of two or more of the other structure types defined | 1938 | $1,604,314 | NA |
3 | San Pedro Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1971 | $1,021,918 | NA |
2 | Taper Elementary | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1965 | $398,390 | NA |
2 | Washington Prep Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1927 | $1,594,119 | NA |
2 | Washington Prep Senior High | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1937 | $1,662,484 | NA |
3 | Wilmington Middle School | Classroom | Mixed construction containing a combination of two or more of the other structure types defined | 1951 | $879,112 | NA |
3 | Wilmington Middle School | Auditorium | Mixed construction containing a combination of two or more of the other structure types defined | 1954 | $1,000,409 | NA |
3 | Wilmington Pk Elementary | Classroom/Admin | Mixed construction containing a combination of two or more of the other structure types defined | 1925 | $3,057,722 | NA |
2 | Woodcrest Elementary | Classroom | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $1,074,813 | NA |
2 | Woodcrest Elementary | Auditorium | Concrete shear wall with flexible floor and roof diaphragms | 1926 | $298,435 | NA |
Sources: Los Angeles Unified School District